HomeSupply & Mining

Bitcoin’s Halvings, Explained

Every 210,000 blocks, the amount of new bitcoin paid to miners per block is cut in half. Here is each halving so far, from the genesis block to the 5th halving still to come, with the block, date, subsidy, fees and price on the day.

Data as of · block data from mempool.space · prices in USD from Blockchain.com’s daily series

CNBC International video explaining the bitcoin halving
Pictured: CNBC International’s explainer on the bitcoin halving, the video for section 1, “A coded schedule”. The subsidy halves every 210,000 blocks and has been 3.125 BTC since April 2024.
Bitcoin’s Halvings, Explained: bitcoin halvings, data as of 2026-10-07
Event Block Date Subsidy before Subsidy after New BTC per day BTC issued before it Fees in block (BTC) Days since previous BTC price that day Price 1 year later Status
Genesis block 0 Jan 3, 2009 18:15 UTC — 50 BTC 7,200 0 0.00 — — — Done
1st halving 210,000 Nov 28, 2012 15:24 UTC 50 BTC 25 BTC 3,600 10,500,000 13.56 1,425 $12.45 $1,014 Done
2nd halving 420,000 Jul 9, 2016 16:46 UTC 25 BTC 12.5 BTC 1,800 15,750,000 0.58 1,319 $647.41 $2,510 Done
3rd halving 630,000 May 11, 2020 19:23 UTC 12.5 BTC 6.25 BTC 900 18,375,000 0.91 1,402 $8,617 $56,750 Done
4th halving 840,000 Apr 20, 2024 00:09 UTC 6.25 BTC 3.125 BTC 450 19,687,500 37.63 1,440 $64,992 $85,173 Done
5th halving 1,050,000 Not yet 79,665 blocks to go 3.125 BTC 1.5625 BTC 225 20,343,750 — — — — Scheduled

Subsidy = new BTC per block under Bitcoin Core’s schedule (fees not included). New BTC per day = subsidy × 144, the number of blocks in a day at the 10-minute target. BTC issued before it = the schedule’s total for all earlier blocks, including coins that were never claimed or have since been lost. Fees in block = the transaction fees paid in that exact block (mempool.space). Prices are Blockchain.com’s daily USD price for the UTC day; the genesis block predates any market price.

How it works

1

A coded schedule

Every block a miner adds to the bitcoin blockchain pays them a fixed amount of new bitcoin, the block subsidy. Bitcoin Core’s GetBlockSubsidy() starts it at 50 BTC and halves it every 210,000 blocks: the code divides the block height by 210,000 and shifts the subsidy right that many times. Its own comment says this happens “approximately every 4 years”.12 Nobody votes on a halving, and no company or government schedules it. Changing it would take a change to the rules that every node enforces.

Timing

Why about four years

The network targets one block every 10 minutes and adjusts mining difficulty every two weeks to hold that pace.2 At 10 minutes a block, 210,000 blocks take about 1,458 days. In practice the gaps have run 1,319, 1,402 and 1,440 days, slightly under four years each, because blocks have on average arrived a little faster than every 10 minutes.345

Supply

The 21 million cap

Because each era issues half as much as the one before, total issuance converges on 21 million BTC, the MAX_MONEY limit in Bitcoin Core.6 By the 4th halving in April 2024, 19,687,500 BTC (93.75% of that total) had been issued under the schedule. Each later era adds only half as many coins as the one before it. The new-coin rate is now 3.125 BTC a block, about 450 BTC a day.

Miners

Subsidy plus fees

Miners also collect the transaction fees in each block. Fees matter more as the subsidy shrinks. Block 840,000, the first block after the 2024 halving, paid 37.63 BTC in fees on top of its 3.125 BTC subsidy, more than ten times the subsidy.5 At the earlier halvings, the first block’s fees ranged from 0.58 BTC in 2016 to 13.56 BTC in 2012.37

Price

What the price did

The table records bitcoin’s price on each halving day and one year later, as observed. It was $12.45 on the first halving day and $1,014 a year later. After the 2016 halving it went from $647.41 to $2,510, after 2020 from $8,617 to $56,750, and after 2024 from $64,992 to $85,173.8 Many other things moved the price in the same periods, and these four data points don’t show that a halving caused any of the moves.

Next

The 5th halving

The next halving is at block 1,050,000, when the subsidy falls to 1.5625 BTC. On October 7, 2026 the chain was at block 970,335, so 79,665 blocks remained.91 At the 10-minute target that is about 553 days, but the actual date depends on how fast blocks arrive.

Sources

  1. Bitcoin Core, GetBlockSubsidy() in src/validation.cpp, master branch, retrieved 2026-10-07.
  2. Bitcoin Core, src/kernel/chainparams.cpp (mainnet nSubsidyHalvingInterval = 210000, nPowTargetSpacing = 10 * 60, nPowTargetTimespan two weeks), retrieved 2026-10-07.
  3. mempool.space, Bitcoin block 420,000 (timestamp, subsidy and fees), retrieved 2026-10-07.
  4. mempool.space, Bitcoin block 630,000 (timestamp, subsidy and fees), retrieved 2026-10-07.
  5. mempool.space, Bitcoin block 840,000 (timestamp, subsidy and fees), retrieved 2026-10-07.
  6. Bitcoin Core, src/consensus/amount.h (MAX_MONEY{21'000'000 * COIN}), retrieved 2026-10-07.
  7. mempool.space, Bitcoin block 210,000 (timestamp, subsidy and fees), retrieved 2026-10-07.
  8. Blockchain.com, Market Price (USD), daily average USD price across major exchanges, via the charts API, retrieved 2026-10-06; cross-checked from 2016 against Yahoo Finance’s BTC-USD daily closes.
  9. mempool.space, current block height (970,335 at 11:33 UTC on 2026-10-07), retrieved 2026-10-07.
  10. mempool.space, Bitcoin block 0 (timestamp, subsidy and fees), retrieved 2026-10-07.

For information only. Not financial advice. See the terms of use.